Skip to main content

Changeover switches · CoC

Generator Changeover Switch Repairs and Installation

We repair, replace and install generator changeover switches across Gauteng, from the manual switch a home or portable generator plugs into to the changeover on a standby set. We issue and sign the electrical Certificate of Compliance (CoC) for the changeover switch installations we carry out.

Callout fee waived when you accept our written quote. 1-year workmanship guarantee. See prices

  • CoC signed for our installations
  • Manual and automatic changeovers
  • Board left closed for you
  • Written quote first
  • Onsite across Gauteng
Red Honda EP6500CXS petrol generator on a pallet, plugged in and wired to a changeover box against a brick wall

What the switch is for

What a changeover switch does, and why it matters

A changeover switch connects your circuits to either the mains or the generator, never both. That separation is what stops the generator feeding power back into the street, where it can kill someone working on the lines, and stops the mains returning straight into your generator.

A manual changeover is moved by hand when the power fails and again when it returns. An automatic transfer switch (ATS) does the same job by itself, together with a generator that starts automatically. If your set already has an ATS that is not working, our ATS repairs page covers it.

Plugging a generator into a wall socket with a double-ended lead bypasses all of this. It back-feeds the mains, leaves exposed pins live and can start a fire. A properly installed changeover switch is the safe connection.

Changeover work is part of your fixed wiring, so it has to be compliant. We issue and sign the electrical Certificate of Compliance (CoC) for the changeover switch installations we carry out. Keep the certificate with your property records.

Yellow Turner Morris S-TMGD8000SILE-220 silent diesel generator with ATS panel in a brick alcove on a green mat

Faults

Changeover switch problems we repair

Leave the board closed and describe what happens. These faults involve live circuits, so we make the supply safe before we open anything.

  • Generator runs, the house stays dark

    The set produces power but it does not reach your circuits. We test the generator output first, then follow the supply through the switch.

  • Only some circuits work on the generator

    Usually a wiring choice made when the switch was fitted, or a failed pole. We check which circuits the changeover actually feeds.

  • Heat, buzzing or burn marks

    Loose terminals or an undersized switch overheat under load. Switch the generator off and call us; this is a fire risk.

  • Earth leakage trips only on the generator

    It can come from the generator, the changeover arrangement or the house wiring. We test each part separately to find where it starts.

  • Stiff, broken or loose handle

    A worn mechanism can leave the switch between positions. We replace a switch that no longer changes over cleanly.

  • Improvised connections

    Double-ended leads or a generator wired straight into the board are replaced with a proper changeover and connection point.

Installation

How a changeover switch is installed

  • 01

    Site check

    We look at your board, the generator and how it will connect, and agree which circuits the generator should carry.

  • 02

    Size and type

    The switch is rated for the generator and the load, single-phase or three-phase, manual or automatic.

  • 03

    Written quote

    You get a written quote for the switch, the connection point and the wiring before any work starts.

  • 04

    Installation

    The switch is fitted and labelled so anyone at home or on site can see which position is mains and which is generator.

  • 05

    Testing

    We test both positions on the mains and on the generator, and prove the generator can never connect to the mains.

  • 06

    Certificate of Compliance

    We issue and sign the electrical Certificate of Compliance (CoC) for the changeover switch installations we carry out.

Manual changeover or automatic transfer switch?

Both separate the generator from the mains. The difference is who moves the switch and how long you are without power.

Manual changeover switchAutomatic transfer switch (ATS)
How it switchesSomeone moves the handle when the power fails and when it returnsIt senses the mains failing and returning, and switches by itself
Generator neededAny generator, including a portable oneA generator with automatic start and a controller that works with the ATS
Time without powerUntil someone starts the generator and moves the switchUsually seconds: the time the set takes to start and settle
SuitsHomes and small premises with a portable or manually started setStandby sets at homes, businesses and sites that cannot wait
Relative costLowerHigher: the switch, its controls and a generator able to start itself

Not sure which circuits a generator can carry? Our generator sizing guide explains starting loads, and the size calculator gives an estimate.

Common Questions

Changeover switch questions

Do you issue a Certificate of Compliance for changeover switches?

Yes. We issue and sign the electrical Certificate of Compliance (CoC) for the changeover switch installations we carry out.

Can I plug my generator into a wall socket instead?

No. A double-ended lead feeds power back into the mains, leaves exposed pins live and can start a fire. Use extension leads from the generator to individual appliances until a changeover switch is fitted.

Should I get a manual changeover or an ATS?

A manual switch suits a portable or manually started set where someone is home to switch over. An ATS suits a standby set that must take over by itself. The table above compares them.

Can a manual changeover be upgraded to automatic?

Often, if the generator can start automatically and its controller works with an ATS. We check the generator and the board first and quote what the upgrade needs.

Which circuits should be on the generator?

Usually lights, plugs, the fridge, the gate and alarm, and the router; heavy loads such as geysers and stoves only if the generator is big enough. We agree the circuits with you during the site check.

What does a changeover switch installation cost?

It depends on the switch type and rating, single- or three-phase, and how far the generator is from the board. You get a written quote after the site check, before any work starts.

My changeover is warm or smells of burning. What should I do?

Switch the generator off, keep the board closed and call us. Heat and burning smells point to loose terminals or an overloaded switch, which are fire risks.

Still unsure what the fault is? Call or WhatsApp 082 057 4605 for onsite diagnosis.

Service Areas

Onsite visits across Gauteng

We come to your generator anywhere in Gauteng, 24/7. Choose your region for local suburbs, call-out details and the faults we see most there.

What to send before we attend

These details help us plan the visit and bring the right parts. Send what you can on WhatsApp; if you can’t find the model number, we still book the visit.

Location
The suburb or site, so the visit can be booked in the right area.
Make and model
The generator brand and model, if they are known.
kVA
The size printed on the data plate.
Fuel type
Diesel, petrol, LPG, natural gas, or dual-fuel.
Controller model
The module name on the panel, when it is visible.
Fault or alarm
What the set does, and any text on the screen.
Photos
The generator, the data plate, and the controller or alarm. Send these on WhatsApp.

Book a Visit

Tell us about the changeover

Say whether it is a new installation or a fault, single- or three-phase if you know, and what the generator is. Please keep the board closed.

Photos of the generator and the data plate can be sent on WhatsApp.

Add your email (optional)
  • Free written quote before any work starts
  • Callout fee waived when you accept the quote
  • 1-year workmanship guarantee

We use your details only to reply to this enquiry and never sell or share them for marketing. Privacy policy

What happens next

  1. We reply with questions about the generator, or to book a visit.
  2. A technician comes to you. For a breakdown we arrive within 1 hour.
  3. The fault is diagnosed on site and you get a written quote. No work starts until you accept it.

Charlie, lead technician: Degree in Mechanical Engineering, Degree in Electrical Engineering, Diesel Plant Fitter. Generator specialists since 2000.